audi scott
2311 scott Ave, los Angeles cA 90026
OKOPOD INSTALLATION
this project includes the installation of an oko120 okopod on an existing elevated deck at a private residence in silver lake, los Angeles.
site preparation will include removal and refinishing of the existing pergola overhang, reinforcement of the deck to accommodate the new pod, and removal and replacement of the existing deck railing.
once site preparations are complete, the okopod will be assembled, positioned, and professionally installed, with careful consideration given to the existing architecture and overall aesthetic of the property.
estimate notes: this proposal is a preliminary estimate based on the anticipated scope of work. Final pricing will be confirmed once the design, materials, and construction details have been reviewed and approved by the client. Materials required for deck reinforcement, railing replacement, and associated modifications are not included in this estimate and will be quoted separately.
project estimate
OKO120 OkoPod Installation: $8,800
Pergola Overhang Removal & Refinishing: $1,100
Existing Deck Reinforcement: $700
Deck Railing Removal & New Installation: $1,800
TOTAL ESTIMATED COST: $12,400 ($2,480 Booking Deposit)
Pricing is preliminary and subject to final design approval, structural requirements, and confirmation of the scope of work with the client. Materials required for deck reinforcement, railing installation, and associated modifications are not included and will be quoted separately. Any unforeseen conditions requiring additional work will be reviewed and approved before proceeding.